FlexBase Laufenburg

Aerial photographs for construction documentation using approved drone footage, commissioned by FlexBase. (Swissgrid no-fly zone).

The Laufenburg technology center will eventually have dimensions of 168 meters in length and 79 meters in width.

The world's largest and most modern redox flow battery storage system will be built on an area of over 20,000 square meters. It will have a total capacity of 1.6 gigawatt-hours and a power output of 800 megawatts. (Information provided without guarantee)

In addition to the battery storage facility, a data center for artificial intelligence and a wind tunnel for research and development are being built.

FlexBase Group: "FlexBase Service AG FB Real Estate AG FB Power AG FB Data AG FB Storage AG"

Update Year in Review:       May 18, 2026

Update FlexBase Gallery 3: September 26, 2026

FlexBase Technology Center Laufenburg: Construction documentation Martin Schnetzler
FlexBase Technology Center Laufenburg: Construction documentation Martin Schnetzler

FlexBase Technology Center and Battery Storage Laufenburg

Gallery Clips

FlexBase flyovers 01-05-2026

FlexBase Technologiezentrum Drohnen-Überflug am 01-05-2026

1. FlexBase concrete slab dated 20-03-2026

FlexBase Technologiezentrum Laufenburg: Erste Boden Platte betoniert und mit der  Drohne gefilmt

FlexBase excavation on 27-11-2025

FlexBase Aushub am 27-11-2025

FlexBase excavation on 19-10-2025

FlexBase Baustelle vom 19-10-25

FlexBase Descent and Pass-Through 03-04-2026

FlexBase Laufenburg bei Sink- und Ueberflug

FlexBase flyover on 06-03-2026

FlexBase Laufenburg: Überflug 06-03-2026

FlexBase sightseeing flight on 12-11-2025

Überflug um die Baustelle am 12-11-25

FlexBase excavation on 12-09-2025

Aushub FlexBase am 12-09-25

FlexBase pile foundation

Pfahlgründung